| Now for the Loading Arm Information
Number of Arms:
Loading or Unloading: Loading , Unloading , Both
Pipe Size: 2" , 3" , 4" , 6" , Other
Flow Rate: GPM Pressure: PSI
Product to be handled:
Product temperature:
Dry Line: Yes , No
If Yes, preferred bend construction: Long Radiusels , Sweeples , Tees
Is a vapor and/or purge line require: Yes , No
Please describe:
Required method: Tight Fill , Splash Fill , Submerged Fill
Other
If tight fill, what type of connection is required:
Flanged , Union , Vapor Cone , Vapor Plate , Coupler , Adapter
Other
Where applicable describe existing loading/unloading equipment
Loading arm metal material:
Swivel joint seal material:
Service both sides of the platform: Yes , No
Now for the Loading Arm Location
Using the diagram on the right, please complete the appropriate dimensions:
A. Tank truck (highest)
B. Tank truck (lowest)
C. Center (tank truck to riser)
Max: , Min:
D. Tank truck (center to platform edge)
E. Platform (height from ground)
F. Riser height (upfeed)
G. Riser height (horizontal feed)
H. Riser height (downfeed)
J. Canopy to platform
K. Safety rail to riser center
L. Safety rail to truck (highest)
X. Distance between risers
Y. Center to fills (max & min reach)
Additional Considerations
Nearest obstruction
Piping: , Metering
Other (describe)
That's it!
Hit submit and one of our Loading Arm advisors will go to work for you!
|