| Now for the Loading Arm Information
Number of Arms:
Loading or Unloading: Loading , Unloading , Both
Pipe Size: 2" , 3" , 4" , 6" , Other
Flow Rate: GPM
Pressure: Positive , Negative , Supply Valve
Product to be handled:
Product temperature:
Dry Line: Yes , No
If Yes, preferred bend construction: Long Radiusels , Sweeples , Tees
Is a vapor and/or purge line require: Yes , No
Please describe:
Required Method: Tight Fill , Splash Fill , Suction
Other
If tight fill, what type of connection is required:
Flanged , Union , Vapor Cone , Vapor Plate , Coupler , Adapter
Other
Where applicable describe existing loading/unloading equipment
Loading arm metal material:
Swivel joint seal material:
Service both sides of the platform: Yes , No
Now for the Loading Arm Location
Using the diagram on the right, please complete the appropriate dimensions:
Connections to be made at the following points:
1 , 2 , 3 , 4 , 5 , 6
If more than one connection is required,
Distance between connections
Connection Sequence:
I. Riser (drop feed) height
J. Riser (horizontal)
K. Riser (up feed)
L. Center/Face (riser to tank car)
M. Connection height (top)
N. Connection height (bottom)
Additional Considerations
Risers are: 150# flanged , 300# flanged , Threaded , Other
Distance of closest obstructions:
Safety Rail
Canopy
Piping
Support Beam
Other
That's it!
Hit submit and one of our Loading Arm advisors will go to work for you!
|